Context - The Central Bureau of Investigation (CBI) conducted raids at 30 locations on Thursday (February 22) at three places linked to former Jammu and Kashmir Governor Satya Pal Malik. The agency is investigating alleged corruption in the award of a contract for the Kiru Hydel Project, in J&K’s Kishtwar district.
Key facts related to the project:

- Kiru hydroelectric power project is a run-of-the-river scheme.
- It is being developed over the Chenab River in the Kishtwar Tehsil of Doha district in Jammu and Kashmir (J&K), India.
- The project site lies approximately 1.5km downstream and 0.5km upstream at the convergence point of the Chenab River with the Singad and Bela streams.
- It includes the construction of a concrete gravity dam on the Chenab River.
- The project is being developed by Chenab Valley Power Projects (CVPP), a joint venture between National Hydroelectric Power Corporation (NHPC, 49%), Jammu & Kashmir State Power Development Corporation (JKSPDC, 49%) and Power Trading Corporation (PTC, 2%).
