Indian Rivers

Flash Flood in Subarnarekha River

Context: The Subarnarekha River has flooded large parts of Balasore district in Odisha, affecting over 50,000 people and inundating dozens of villages.

Relevance of the Topic: Prelims: Key facts about Subarnarekha River; Flash Flood. 

Subarnarekha River

  • Subarnarekha (literally means Streak of Gold) is a rain-fed river that originates near Ranchi, the capital of Jharkhand on the Chhotanagpur plateau.
  • The river flows through Jharkhand, West Bengal, Odisha and drains into the Bay of Bengal. The total length of the river is 395 kilometres. 
  • Kanchi and Karkari rivers are its chief tributaries.
  • Subarnarekha passes through areas with extensive mining of copper and uranium ores. As a result of unplanned mining activities, the river is polluted. It has been the lifeline of tribal communities inhabiting the Chhotanagpur region, and water pollution affects their livelihood. 
image 41

Flood and Flash Flood:

  • Flood: An overflow of water onto normally dry land. The inundation of a normally dry area caused by rising water in an existing waterway, such as a river, stream, or drainage ditch. Ponding of water at or near the point where the rain fell. Flooding is a longer term event, it may last days or weeks.
  •  Flash flood: A flood caused by heavy or excessive rainfall in a short period of time, generally less than 6 hours. It can also occur even if no rain has fallen, for instance after a levee or dam has failed, or after a sudden release of water by a debris or ice jam. The intensity of the rainfall, the location and distribution of the rainfall, the land use and topography, vegetation types and growth/density, soil type, and soil water-content all determine the intensity and impact caused by flash flood. 

Also Read: Small peninsular rivers flowing towards East

Siang hydropower project of Arunachal Pradesh

Context: Protests broke out at the Upper Siang district in Arunachal Pradesh as Hydroelectric Power Corporation (NHPC) is gearing up to carry out a pre-feasibility study for the proposed 11,000 MW Siang Upper Multipurpose Project. Locals are protesting citing concerns over its environmental and social impacts.

Relevance of the Topic: Prelims: Key facts about Siang Hydropower Project; Siang River; Adi Tribes

Siang Upper Multipurpose Project:

  • Proposed 11,000 MW Multipurpose Project in the Siang river. 
  • Location: Upper Siang district, Arunanchal Pradesh. 

Need for the Project: 

  • Handle possible threats from the 60,000 MW power project (the world’s biggest hydropower dam) being constructed by China in the upper reaches of Yarlung Tsangpo river in Tibet (called Siang in Arunachal Pradesh). China is not a signatory to the International Water Conventions. It intends to divert the water from the multiple water reservoirs to dry regions of Tibet and elsewhere in the country. 
  • Siang Upper Multipurpose Project aims to maintain natural flow of water in the Siang river throughout the year, and flood modulation in case of sudden water release by China.

Concerns: 

  • Displacement: The project is estimated to affect at least 100,000 local residents (in the upper Siang district) who could be displaced. 
  • Environmental concerns: There are also concerns about the environmental impact of the project involving construction activities on the Siang River.

About Siang River

  • The Tsangpo – Yarlung Zangbo, as it is known in China – enters Arunachal Pradesh, where it is known as the Dihang (or Siang) River.
  • It traverses more than 1,000 km eastward, before forming a horseshoe bend around the towering Namcha Barwa peak, and enters Arunachal Pradesh as the Siang (or Dihang). 
  • It turns towards the south and enters Assam, where it is joined by two mountain streams, the Lohit and the Dibang, and thereafter it is known as the Brahmaputra.
  • River Teesta joins Jumna (Brahmaputra in Bangladesh) as a right bank tributary.
  • Jumna moves further and joins Padma which then joins Meghna. Meghna flows into the Bay of Bengal. 
  • The sub-basin lies in the States of Arunachal Pradesh (Subansiri, Kameng, and Bhareli rivers) , Assam (Manas, Kopili, Sankosh, and Dikhow rivers), Nagaland {Doyang (flows into Dhansiri)}, Meghalaya (Umngot and Kynshi rivers), West Bengal and Sikkim (Teesta)
  • It meanders through the heartland of Arunachal Pradesh, inhabited by the Adis.
image 36
Left/ South bank Tributaries of BrahmaputraRight/ North bank Tributaries of Brahmaputra
DibangSubansari
LohitKameng
Burhi Dihang Manas
KopilliSankosh
Dhansiri (South)Dhansiri (North)
KelangTeesta (Sikkim, WB)
NoadehingRonganadi

Who are the Adi Tribes?

  • It is one of the major tribes of Northeast India.
  • It consists of 14 sub-tribes, namely Ashing, Bori, Bokar, Karko, Komkar, Minyong, Millang, Pasi, Padam, Panggi, Pailibo, Ramo, Shimong and Tangam.
  • They are predominantly inhabited in sub-tropical regions of the Siang belt and Dibang Valley of Arunachal Pradesh.
  • They have Mongoloid features patriarchal society, and possess a strong base of traditional knowledge about forest structure and ecosystem function.
  • They mostly follow the age-old tradition of Animism known as “Donyi Polo”, and practice jhum for their agriculture.
  • The Adi people speak a language also called Adi, which is distantly related to Chinese and Tibetan languages.

Cauvery-South Vellar Linking Project

Context: The Central government is reluctant to approve the Cauvery-South Vellar link project stating various legal and environmental issues.

Relevance of the Topic: Prelims: Questions based on locations of rivers; key facts about Cauvery-South Vellar Link Project.

About Cauvery-South Vellar Link Project

  • Cauvery-South Vellar link project is a significant river-linking initiative proposed by Tamil Nadu government, as part of the first phase of Cauvery-Vaigai-Gundar linking scheme.
  • The project aims to transfer large quantities of water from Cauvery river to the South Vellar River, through a canal system. 
  • Expected benefits of the project: 
    • Agriculture: Irrigation is the primary benefit of the project. 
    • Drought relief: help in mitigation of water scarcity in southern Tamil Nadu during dry seasons.
    • Drinking water: Project will ensure supply of drinking water to urban regions of Tamil Nadu.
Cauvery-South Vellar Linking Project

Challenges Leading to Delay

  • Inter-state dispute: Neighbouring states like Karnataka have objected to the project citing diversion of Cauvery river, one of the primary sources of water in Karnataka.
  • Environmental concerns: The project might fail to meet environmental and ecological standards. Linking projects can impact habitat and river ecology. E.g., Similar concerns delayed the Ken-Betwa river linking project.
  • Lack of comprehensive studies: The project lacks the prolonged study on long-term implication of the project, this became one of the reasons for the center to hold back the consent.
  • Potential of setting a precedent: Approving the project may lead to further demands of river-linking by other states too, that may lead to legal and environmental implications.
  • Economic viability: Financial burden of the project can elevate the cost of Cauvery-Vaigai-Gundar, degrading the economic viability of the complete project.
image 200

Suggested Measures to Address Challenges

  • Facilitating Inter-state dispute: The central government can play a pivotal role in mediating the consensus in Tamil Nadu and Karnataka to facilitate the completion of the project. 
  • Conducting comprehensive EIA: A complete hydrological, environmental and socio-economic impact assessment needs to be conducted to mitigate the negative impacts on livelihood and habitat of the area.
  • Exploring alternative water management: Encourage Tamil Nadu to consider alternative methods like enhancing groundwater recharge, modernising irrigation infrastructure and implementing rainwater harvesting systems as a long-term solution to the water scarcity without causing inter-state disputes.
cauvery - vaigai- gundar link

Facts about Rivers in the Project: 

  • Cauvery: Originates through Talakaveri, Karnataka.
    • States: Karnataka, Tamil Nadu, and Kerala
    • Major conservations area: Nagarhole and Bandipur along its tributaries. Muthupet Mangroves and Pichavaram Mangroves (Tamil Nadu) near its delta region.
    • Tributaries of Cauvery: Bhavani river (flows near Silent Valley Natural Park, Kerala); Amaravati river and Noyyal river. 
  • South Vellar River: Originates from Sivaganga, Tamil Nadu
    • States: Flows entirely within Tamil Nadu
    • It is a non-perennial river dependent on monsoonal rains.
  • Vaigai river: Originates from Varusanadu Hills in Tamil Nadu.
    • The major city near the shore is Madurai.
    • Flows from Srivilliputhur Grizzled Squirrel Wildlife Sanctuary.
  • Gundar river: Originates from Western Ghats in Tamil Nadu.
    • It is a seasonal river, often dry for significant portions of the year.

Parbati-Kalisindh-Chambal Eastern Rajasthan Canal Project

Context: The Detailed Project Report (DRP) on Parbati-Kalisindh-Chambal Eastern Rajasthan Canal Project submitted by Rajasthan will be analysed by various Central agencies.

Relevance of the Topic: Prelims: Key facts about Parbati-Kalisindh-Chambal Eastern Rajasthan Canal Project; key facts about important locations. 

About Parbati-Kalisindh-Chambal Eastern Rajasthan Canal Project

  • PKC-ERCP is a river interlinking project aimed at addressing the water scarcity challenges in the eastern region of Rajasthan.
  • The project will cover 13 districts of Rajasthan and a population of approximately 2.5 crore people.
  • Key details:
    • Water source: ERCP plans to utilise the surplus water from the Chambal basin (particularly Kalisindh, Parvati and Chambal rivers) and redirect it to water-deficient sub-basins such as Banas, Gambhiri, Banganga, and Parbati.
    • Proposed infrastructure: Infrastructure will include a canal, Doongri Dam and associated reservoir.
  • Significance of ERCP: 
    • Water availability: Rajasthan is an arid and semi-arid region facing significant water shortages. ERCP is intended to improve availability in water scarce regions to reduce dependence on erratic rainfall.
    • Irrigation management: The project aims to boost irrigation facilities in 2 lakh hectares in the region, thereby increasing agricultural productivity and supporting the livelihood of farmers.
image 122

Challenges and concerns related to the project

  • Environmental impact: The project involves construction of the Doongri dam and reservoir which will lead to the submergence of regions of the Ranthambore Tiger Reserve. 
  • Restrain biodiversity movement- The reservoir will divide North Ranthambore and south Ranthambore leading the barrier in the migration corridor of species in reserve.
  • Interstate dispute: Neighbouring states like Madhya Pradesh have raised the sharing of Chambal water, this may lead to potential legal and political disputes regarding water sharing.
  • Delays in implementation: The project is witnessing delays as it does not have National project status. Further, environmental activism and poor political will is also delaying the project.
image 123

Way Forward

  • Securing National Project status: Intensifying dialogue with the central government to recognize ERCP as a national project may accelerate the development
  • Dialogue with neighbours: Rajasthan government should have proper dialogue with Madhya Pradesh government to build consensus over water sharing agreement of Chambal.
  • Alternate green corridor: Detailed Environmental Impact Assessment should be conducted to find an alternate green corridor for migration of the species in Ranthambore Tiger reserve.
  • Using technology: A proper planning of identifying water resources and long term impact should be predicted by using geo-spacial satellites and hydraulic modeling.
  • Community participation: ERCP will impact tribals like Van Gujjars of Ranthambore Tiger reserve region. These communities should be considered under planning of the project to evaluate the alternate livelihood for them. 
  • Focus on micro-irrigation: ERCP will only provide water but the focus should be on effective utilisation of the water. Therefore, micro-irrigation projects like sprinkler and drip should be promoted in the region.

About Tiger Reserves in Rajasthan

  • Ranthambore Tiger Reserve: 
    • Located in Sawai Madhopur region of Rajasthan.
    • It is nestled between Aravali in the West and Vindhya ranges in the East side.
    • Banas river flows through the reserve. Banas is a tributary of Chambal river.
  • Sariska Tiger Reserve (Alwar): Situated in the Aravalli Hills, Sariska is known for its efforts in tiger relocation and conservation. It also houses historical ruins like the Kankwari Fort.
  • Mukundra Hills Tiger Reserve (Kota): A newer reserve established in 2013, it spans the Mukundra Hills and aims to expand tiger habitats in Rajasthan.
  • Ramgarh Vishdhari: It is the fourth Tiger reserve of Rajasthan and 52nd Tiger reserve of the nation declared in 2022. Mej river, a tributary of Chambal flows through this region. Famous for Monitor Lizards.

Ken-Betwa Link Project

Context: The Prime Minister of India laid the foundation stone for the Ken-Betwa river linking project in Khajuraho, Madhya Pradesh. 

Relevance of the Topic: Prelims: Key facts about Ken-Betwa link project; Ken river; Betwa river. 

Ken-Betwa link project

  • The Ken-Betwa link project envisages transferring of surplus water from Ken basin to water short areas of Betwa basin by substitution. Both rivers are tributaries of the Yamuna. 
Ken-Betwa link project
  • The Ken-Betwa link project will be implemented in two phases.
    • Phase I: involves construction of 77 m high Daudhan dam across river Ken.
    • Phase II: involves construction of Lower Orr dam, Kotha Barrage and Bina Complex.
  • The estimated cost of the project is around ₹45,000 crore.

Ken River:

  • It is an interstate river between Uttar Pradesh and Madhya Pradesh.
  • It is a tributary of the Yamuna.
  • It originates from the north-west slopes of the Kaimur hills in the Jabalpur district of Madhya Pradesh.
  • The river joins the Yamuna river near village Chilla (Banda district), near Fatehpur in Uttar Pradesh.
  • The river is the last tributary of Yamuna before the Yamuna joins the Ganga.
  • The important tributaries of Ken are - Alona, Bearma, Sonar, Mirhasan, Shyamari, Banne, Kutri, Urmil, Kail and Chandrawal.

Betwa River:

  • The Betwa river originates in the Raisen district of Madhya Pradesh south-west of Bhopal.
  • It is an interstate river between the two states viz. Madhya Pradesh and Uttar Pradesh. 
  • It flows in a northeasterly direction through Madhya Pradesh and enters into Uttar Pradesh near village Bangawan of Jhansi district.
  • The river joins the Yamuna near Hamirpur in Uttar Pradesh.
  • Important tributaries of Betwa are - Bina, Jamini, Dhasan, Birma, Kaliasote, Halali, Bah, Saga, Narain and Kaithan.

Background:

  • Ken-Betwa Link is the first project under the National Perspective Plan for interlinking of rivers, which was prepared in 1980.
  • A major breakthrough came in the year 2005 when a tripartite memorandum of understanding for preparation of a detailed project report (DPR) was signed among the Central government, Uttar Pradesh and Madhya Pradesh.
  • In 2008, the Centre declared the Ken Betwa Link Project (KBLP) a National Project. Later, it was included as part of the Prime Minister’s package for the development of the drought-prone Bundelkhand region.

Significance:

  • The project is expected to provide annual irrigation to 10.62 lakh hectares (8.11 lakh ha in MP and 2.51 lakh ha in UP) of land, and supply drinking water to about 62 lakh people.
    • It is aimed at solving the water woes of the Bundelkhand region, spread across parts of Uttar Pradesh and Madhya Pradesh. 
    • It will benefit the water-starved region, especially the districts of Panna, Tikamgarh, Chhatarpur, Sagar, Damoh, Datia, Vidisha, Shivpuri and Raisen of Madhya Pradesh, and Banda, Mahoba, Jhansi and Lalitpur districts of Uttar Pradesh.
  • It aims to generate more than 100 MW of hydropower and 27 MW of solar energy.

Challenges and Criticism: 

1. Environmental: 

  • The project will involve large-scale deforestation inside the heart of the Panna National Park and Tiger Reserve.
    • Experts have raised serious concerns about submergence of around 98 sq km of Panna national park, and felling of about two to three million trees.
    • The Supreme Court’s Central Empowered Committee (CEC) has pointed out that the project will undo the successful tiger reintroduction that helped the tiger population bounce back from local extinction in 2009.
  • CEC also noted that in its downstream side, Daudhan dam is likely to affect the Gharial population in the Ken Gharial sanctuary along with vulture nesting sites.
  • A study published by IIT Bombay highlighted that moving large quantities of water as part of river linking projects can affect land-atmosphere interplay and feedback and lead to a mean rainfall deficit by up to 12 per cent.

2. Economic: 

  • The Supreme Court’s Central Empowered Committee (CEC) had raised questions on the economic viability of the project. It suggested that the first focus should be on  exhausting other irrigation options in the upper Ken basin before taking up any such large scale project.

3. Social:

  • Since its inception the project has witnessed severe protest over the issue of inadequate compensation and rehabilitation plans. The dam will displace 5,228 families in Chhatarpur district and 1,400 families in Panna district due to submergence and project-related acquisition. 

As per the Ministry of Jal Shakti the project will pave the way for more river interlinking projects to ensure that scarcity of water does not become an inhibitor for development in the country.

Brahmaputra's tributary Beki changes its course

Context: Recently, Beki which is a tributary of Brahmaputra changed its course resulting in displacement of thousands of people and a state highway in lower Assam.

About Beki River

  • Beki River is one of the right bank territories of Brahmaputra River.
  • Manas River originates in Bhutan, when it enters India - Manas River branches into three streams or channels- Manas, Beki and Hakuwa which later merge into the Brahmaputra River.
  • Since the channel of Manas and Hakuwa has been experiencing high siltation, almost all the flood discharge of the Manas River passes through the Beki River.
  • Beki River passes through the Manas National Park consisting of semi-evergreen, forest vegetation and mixed deciduous, littorals and swamps and interspersed with bamboo and cane.
  • Beki River causes large-scale flooding in the large part of Manas Bio-reserve.
image 23

(Map of Beki River)

Sutlej Yamuna Link (SYL) Canal

Context: The Supreme Court has ordered the government of Punjab to complete the construction of the SYL project.

What is a Sutlej Yamuna Link (SYL) Canal?

  • Sutlej Yamuna Link (SYL) Canal running about 121 km in Punjab and 90 km in Haryana aims to provide 3.45 MAF out of 3.5 MAF of Haryana’s average annual share of surplus Ravi-Beas waters (as per 1981 agreement). 
  • It will irrigate an area of 4.46 lakh ha. in Haryana and also benefit Punjab in terms of irrigation to an area of 1.28 lakh ha, and in terms of power, a total of 50 MW of power generation at two power houses.

Brief Background on the Issue

  • The issue dates back to 1966 at the time of reorganisation of Punjab and formation of Haryana. Punjab was opposed to sharing the waters of the two rivers with Haryana, citing riparian principles.
  • In 2020, the Supreme Court (SC) asked the Central Government to mediate between CMs of Punjab and Haryana to find an amicable solution to SYL Canal dispute.
  • In 2023, Centre told SC that talks between the two states have failed as Punjab refused to construct its part of the canal.
image 13

About Satluj River

  • The Satluj originates in the ‘Rakshas tal’ near Mansarovar at an altitude of 4,555 m in Tibet where it is known as Langchen Khambab. 
  • It flows almost parallel to the Indus for about 400 km before entering India, and comes out of a gorge at Rupar. 
  • It passes through the Shipki La on the Himalayan ranges and enters the Punjab plains. 
  • It is an antecedent river. It is a very important tributary as it feeds the canal system of the Bhakra Nangal project.

About Ravi River

  • The Ravi is another important tributary of the Indus. 
  • It rises west of the Rohtang pass in the Kullu hills of Himachal Pradesh and flows through the Chamba valley of the state. 
  • Before entering Pakistan and joining the Chenab near Sarai Sidhu, it drains the area lying between the southeastern part of the Pir Panjal and the Dhauladhar ranges.

About Beas River

  • The Beas is another important tributary of the Indus, originating from the Beas Kund near the Rohtang Pass at an elevation of 4,000 m above the mean sea level.
  • The river flows through the Kullu valley and forms gorges at Kati and Largi in the Dhauladhar range. 
  • It enters the Punjab plains where it meets the Satluj near Harike.

About Yamuna River

  • It is the western most and the longest tributary of the Ganga, and has its source in the Yamunotri glacier on the western slopes of Bandarpunch range. 
  • It joins the Ganga at Prayag (Allahabad). 
  • It is joined by the Chambal, the Sind, the Betwa and the Ken on its right bank which originates from the Peninsular plateau while the Hindan, the Rind, the Sengar, the Varuna, etc. join it on its left bank. 
  • Much of its water feeds the western and eastern Yamuna and the Agra canals for irrigation purposes.

National Workshop On Integrated Management Of Sediments In River Basins And Reservoirs For Sustainable Development

Context: The Central Water Commission under Ministry of Jal Shakti organized a one-day national workshop on ‘Integrated Management of Sediments in River Basins and Reservoirs for Sustainable Development” at India International Centre in New Delhi. It was largely agreed that short and long term action plans need to be prepared along with measures to control silt deposition in Reservoir which may be implemented in phases.

image 136

What are sediments?

  • Sediment is a naturally occurring material, organic and inorganic, that is moved and deposited in a new location by water, wind or ice. 
  • It is broken down and transported by processes of weathering and erosion. 
  • They can consist of rocks, minerals, remains of plants and animals. 
  • It can be as small as a grain of sand or as large as a boulder.
  • Sediment that is light enough to be carried by water without touching the stream bed is called suspended sediment.
  • Sediment created and deposited by glaciers is called moraine.

What is siltation and sedimentation?

  • Rivers flowing in the alluvial plains tend towards a stable flow condition. In other words, they try and maintain a balance between the silt load carried and the volume and velocities achieved by the flow. This is usually called a stable sediment regime for the river. 
  • When the core parameters of volume and velocities are disturbed, either due to a low gradient (while it enters the plains) or encroachment in flood plain, widening of the channel (braiding of river streams) suspended silt particles in the river water settle down. This is called siltation. 
  • This phenomenon is normally called sedimentation when it occurs in a reservoir.

Why sediments are important? 

  • Source of nutrients: Sediment is important because it usually enriches the soil with nutrients forming large fertile plains. Areas rich in sediments are often also rich in biodiversity. The rivers lacking in sediments (mostly downstream rivers of dams,) are known as ‘hungry waters’. 
  • Landform development: Sediment deposition create several landforms like natural levees, embankments, deltas and river banks, flood plains beaches, spits and sand bars etc.
  • Ecological functions: Sediment processes are an extremely important part of many ecosystems as well as of primary importance to particular species. For example, various organisms in both marine and freshwater environments rely on replenishment of sediment for their reproductive habitat. 
  • Natural water filtration: When water passes through soil, it is cleaned via physical, chemical and biological processes. In addition to soil's physical filtration capacity, soil contains important biota that helps transform and decompose certain chemicals and other contaminants from soil, thus helping filter them out of the water.
  • Disaster management: Sediment is one of the main tools in coastal zone management. Huge amounts of sediment are being used for flood protection (e.g. beach nourishment), and habitat and wetland protection.
  • Following chart can help us to analyse the role of sediments in various spheres;
What are sediments

What is the effect of sand mining on sedimentation in rivers?

Mining of sand, if done at an optimum level, removes excessive sediment deposit in rivers. 

  • Unscientific and excessive sand mining depletes the mineral at rates at which the river system cannot replenish it. 
  • Excessive mining creates high over banks with steep slopes, which are not stable due to the limited shear strength of the constituent soil materials. 
  • Continued collapse of such banks leads the river course to deviate towards developed lands and poses an ever-increasing threat to them.

What are the causes of reservoir sedimentation ? 

Generally, soil erosion is the major cause of reservoir sedimentation and subsequent sedimentation of reservoirs is a complex process dependent upon a number of natural and anthropogenic factors. 

The causes are classified into two with respect to the factors, namely; 

  1. Natural Causes 
    1. Geomorphology - configuration of the land surface including the location, size and shape of such physical features as hills, ridges, valleys, streams and lakes.
    2. Hydrology - To be successful, a dam and reservoir project must have an adequate and continuous supply of water. The annual rainfall, the ratio of watershed area to reservoir area, and the volume of stream of the year must be known.
    3. Hydrogeology - to determine whether groundwater would contribute to the reservoir or whether the reservoir would lose water to the groundwater system is also essential.
    4. Soil characteristics - The type of soil and its properties such as porosity and permeability can cause or lead to erosion within and around the reservoir.
  2. Anthropogenic Causes 
    1. Tillage practices: Wrong tillage practices can cause loose soil thereby leading to washing away of top soil. 
    2. Overgrazing: Too much grazing of vegetation by animals can lead to exposure of the soil in an area thereby causing erosion. 
    3. Mining and logging: Mining activities can lead to erosion due to wearing off of the surface through surveys and excavation as well. 

What are the problems with sedimentation in dams?

  • Reduction of storage capacity: When a river is put to halt behind a dam, the sediment it contains settles at the bottom of the reservoir. Reservoirs have become settling tanks for the sediment in most cases. This means the dam has less and less space for water, which it was supposed to hold. 
  • Impact on stability: Higher siltation of reservoirs exerts pressure on the reservoir thereby compromising the dam stability.
  • Reduced efficiency of power generation: The high rate of reservoir sedimentation pose a challenge to dam operators due to the abrasion of turbines and other dam components. The cracking of the tips of turbine blades by waterborne sand and silt considerably reduce their generating efficiency and needs costly repairs.
  • Reduced discharge capabilities: Sediments will often block low-level outlets designed to allow for reservoir drawdown. Reduction of spillway capacity can occur as a result of the loss of approach depth when the sediment front reaches the dam.
  • Environmental impacts: Plant and animal species are sensitive to alteration of both the sediment supply and flow regime. Increases in sediment concentration in upstream areas can create turbid waters with a smaller euphotic zone. This decreases plant productivity, negatively impacting fish and bird species and can also cause visual impairment for predatory fish, affecting their feeding habits. Finally, sediment is a primary carrier of suspended pollutants such as nitrogen, phosphorous and heavy metals. Sediments released as a result of sediment management or a dam breach may have environmental effects that can persist for decades.

In India, government statistics on 11 of the country’s reservoirs with capacities greater than one cubic kilometre show that all are filling with sediment faster than expected, with increases over assumed rates ranging from 130 percent (Bhakra) to 1,650 percent (Nizamsagar). A 1990 World Bank paper on watershed development concluded that in India, "erosion and reservoir sedimentation are not only severe and costly but accelerating. It is now obvious that the original project estimates of expected sedimentation rates were faulty, based on too few reliable data over too short a period”.

What steps can be taken in this regard?

  • Reducing sediment inflow: Sediment delivery to reservoir can be reduced by techniques such as erosion control and upstream sediment trapping.
  • Routing the sediments: Some or the entire inflowing sediment load may be hydraulically routed beyond the storage pool by techniques such as drawdown during sediment-laden floods, off stream reservoirs, sediment bypass etc
  • Sediment removal: Deposited sediments may be periodically removed by hydraulic flushing, hydraulic dredging or dry excavation.

Adopting Erosion Control and Soil Conservation Measures:This includes all those general methods which are adopted to reduce erosion of soil and to make it more and more stable. They may include: plantation, control grazing, terracing benching, cover cropping like grassing and contour binding, etc.

"Nine Years On: The Lingering Krishna River Water Dispute between Andhra Pradesh and Telangana"

Context: Despite the passage of nine years since the bifurcation of the combined state, the ongoing dispute between Andhra Pradesh (A.P.) and Telangana regarding the allocation of water from the Krishna river remains unresolved.

The Lingering Krishna River Water Dispute between Andhra Pradesh and Telangana

What is the origin of the Krishna water dispute?

  • The water dispute between Andhra Pradesh (A.P.) and Telangana traces back to the formation of Andhra Pradesh in November 1956.
  • Before the formation of Andhra Pradesh, a Gentlemen's Agreement was signed in February 1956, which aimed to protect Telangana's interests in water resource utilization and ensure equitable distribution based on global treaties.
  • However, the focus on irrigation facilities by the combined dispensation was predominantly on Andhra, neglecting the drought-prone areas in Telangana that had already suffered due to the development of water systems by the British.
  • In 1969, the Bachawat Tribunal (KWDT-I) was established to resolve water sharing disputes among Maharashtra, Karnataka, and Andhra Pradesh (prior to bifurcation).
  • The Tribunal allocated 811 tmcft dependable water to Andhra Pradesh, which was later divided in a 512:299 tmcft ratio between Andhra (including parts of Rayalaseema which comprise the Krishna Basin) and Telangana respectively, based on the command area developed or utilization mechanism established at that time.
  • The Tribunal also recommended utilizing water from the Tungabhadra Dam( a part of the Krishna Basin) for the drought-prone Mahabubnagar area in Telangana, but this recommendation was not implemented, leading to growing discontent.
  • Telangana has repeatedly voiced its grievances, highlighting the perceived injustices in water resource distribution within Andhra Pradesh.

What was the arrangement for water sharing after the bifurcation?

  • The Andhra Pradesh Reorganisation Act, 2014 did not specify water shares as the KWDT-I Award was still in effect and had not made any region-wise allocation.
  • In 2015, a meeting organized by the Ministry of Water Resources resulted in an ad hoc arrangement for water sharing between Telangana and Andhra Pradesh.
  • The agreement set a ratio of 34:66 (Telangana : A.P.) for sharing water, and it was stipulated that the arrangement would be reviewed annually.
  • The focus of the Act was primarily on the management of water resources, leading to the establishment of the Krishna River Management Board (KRMB) and the Godavari River Management Board (GRMB).
  • Despite opposition from Telangana, the KRMB continued to maintain the same 34:66 ratio for water sharing year after year.
  • In October 2020, Telangana demanded an equal share of water until a final water-sharing agreement was reached.
  • In a recent board meeting, Telangana firmly insisted on an equal share and refused to continue with the existing arrangement.
  • As the member states could not reach a consensus, the matter has been referred to the Ministry of Jal Shakti (MoJS) for resolution.

What does each State claim?

Claims by Telangana:

  • Telangana asserts its right to a larger share of water based on global norms and agreements followed for sharing river waters.
  • Telangana has been asking the Centre to finalise water shares from day one of its formation. Citing treaties and agreements followed globally in sharing river waters.
  • Telangana argues that, considering the basin parameters, it is entitled to at least a 70% share in the allocation of the 811 tmcft of water.
  • Telangana highlights how Andhra Pradesh has been diverting around 300 tmcft of water from fluoride-affected and drought-prone areas within the basin in Telangana to areas outside the basin.

Claims by Andhra Pradesh:

  • Andhra Pradesh claims a higher share of water to protect the interests of command areas that have already been developed.

What is the stand of the Centre?

  • The Centre has convened two meetings of the Apex Council, which includes the Union Minister and Chief Ministers of Telangana and Andhra Pradesh, in 2016 and 2020 to address the water-sharing issue.
  • However, the Centre has not taken any concrete steps to resolve the dispute, and the issue remains unresolved.
  • In 2020, the Ministry of Jal Shakti (MoJS) suggested that the matter of water shares be referred to a Tribunal, leading Telangana to withdraw its petition from the Supreme Court with the assurance that the Ministry would address the issue.
  • Despite this, the Centre has not taken any significant action on the matter for over two years.
  • As a result, the two states continue to engage in ongoing disputes and disagreements regarding water sharing without a clear resolution.

Inter-state Water Tribunals

  • Article 262 of the Constitution provides for the adjudication of interstate water disputes. 
  • It makes two provisions:

(i) Parliament may by law provide for the adjudication of any dispute

or complaint with respect to the use, distribution and control of

waters of any inter-state river and river valley.

(ii) Parliament may also provide that neither the Supreme Court nor

any other court is to exercise jurisdiction in respect of any such

dispute or complaint.

  • Under this provision, the Parliament has enacted two laws [the River Boards Act (1956) and the Inter-State Water Disputes Act (1956)]. 
  • The River Boards Act provides for the establishment of river boards for the regulation and development of inter-state river and river valleys. A river board is established by the Central government on the request of the state governments concerned to advise them.
  • The Inter-State Water Disputes Act empowers the Central government to set up an ad hoc tribunal for the adjudication of a dispute between two or more states in relation to the waters of an inter-state river or river valley. The decision of the tribunal would be final and binding on the parties to the dispute. Neither the Supreme Court nor any other court is to have jurisdiction in respect of any water dispute which may be referred to such a tribunal under this Act.

IMPORTANT HIGHLIGHTS – INTER-STATE RIVER WATER DISPUTES ACT, 1956

  • Request by States to Centre to refer river water sharing dispute to the Tribunal.
  • Notification in official gazette of Tribunal by Centre within 1 year of request.
  • Investigation and Submission of Report by Tribunal to the centre and disputing states.
  • Publication of Decision of Tribunal in the Official Gazette.
  • Decision of the Tribunal is final and binding on the parties to the dispute.
  • Dissolution of Tribunal by Central Government after it forwards its report and when Centre is satisfied that no further reference to the Tribunal would be

              needed.

  • Supreme Court or any other Court shall NOT have jurisdiction in respect of any water dispute which may be referred to a Tribunal under this Act.

CONCERNS & PROBLEMS - INTER-STATE RIVER WATER DISPUTES ACT, 1956

  • No timeline has been provided in the Act for completion of the Award.
  • No mechanism for negotiation prior to constitution of Tribunal.
  • Delay in notifying of Tribunal’s decision (Award) by the Centre – perpetuates disputes.
  • Continuous River-Water disputes fuels animosity and furthers regionalism.
  • Formation of new state (Telangana) further aggravates river-water sharing.
  • Hesitation of Centre in constituting Tribunal leads to judicial intervention - Example –Tribunal constituted to settle Mahadayi River water dispute.

Non-adherence of Award by the Tribunal is another concern as hardly states agree on the award and approach Supreme Court for final hearing.

Krishna River

  • The Krishna River originates in the Western Ghats near Mahabaleshwar in the state of Maharashtra in central India. 
  • It is the third-longest river in India, after the Ganges and Godavari. It is also the fourth-largest in terms of water inflows and river basin area in India, after the Ganges, Indus and Godavari.
  •  It is a major source of irrigation in the Indian states of Maharashtra, Karnataka, Telangana and Andhra Pradesh. 
  • Its principal tributaries include the Ghataprabha River, Malaprabha River, Bhima River, Tungabhadra River and Musi River. The Bhima River is the longest tributary of the Krishna River.

Guardians of the Ganga: task force keeps a watchful eye on the river Ganga

Context: Recently, Under the Namami Gange initiative, over 4,000 volunteers actively combat littering and poaching in the river. Their efforts aim to preserve the river's flora and fauna.

Ganga Pollution

  • Rapidly increasing population, rising standards of living and exponential growth of industrialization and urbanisation have exposed water resources, in general, and rivers to various forms of degradation. The mighty Ganga is no exception. 
  • The deterioration in the water quality impacts the people immediately. Ganga, in some stretches, has become unfit even for bathing. The threat of global climate change, the effect of glacial melt on Ganga flow and the impacts of infrastructural projects in the upper reaches of the river, raise issues that need a comprehensive response.

Sources of pollution of Ganga River: 

  • In the Ganga basin approximately 12,000 million liters per day (mld) sewage is generated, for which presently there is a treatment capacity of only around 4,000 mld. 
  • Approximately 3000 mld of sewage is discharged into the main stem of the river Ganga from the Class I & II towns located along the banks, against which treatment capacity of about 1000 mld has been created till date. 
  • The contribution of industrial pollution, volume-wise, is about 20 per cent but due to its toxic and non- biodegradable nature, this has much greater significance. The industrial pockets in the catchments of Ramganga and Kali rivers and in Kanpur city are significant sources of industrial pollution. The major contributors are tanneries in Kanpur, distilleries, paper mills and sugar mills in the Kosi, Ramganga and Kali River catchments.

Issues Faced in cleaning Ganga River 

• Inadequate Sewage treatment: As opposed to around Four thousand MLD treatment capacity available, Ganga basin produces around twelve thousand MLD sewage.

• Pollution from Agriculture: The cumulative use of pesticides has doubled in the last one decade and most of it runs off in our rivers.

• Disruption of Ecological Flow(e-flow): Many interruptions in the flow of the river lead to the reduction in the flow which results in reduced velocity and siltation. This also increases the pollutant concentration. The decrease in flow has led to an increase in groundwater extraction for various uses.

• Challenges of Swachh Bharat: About 180 mld sludge would be generated in five Ganga basin states when they become open defecation free (ODF) and if proper faecal sludge management is not in place, it would invariably pollute the Ganga.

• Escalating costs due to delays in setting up of STPs. An IIT report predicted the cost of treating sewerage to be about 1 paisa per litre at 2010 price levels.

  • NMCG could not utilize any amount out of the Clean Ganga Fund and the entire amount was lying in banks due to non-finalization of action plan.

• Lack of coordination: The cleaning of the Ganga requires seamless coordination between the agencies responsible for carrying out different tasks. Jal Shakti ministry signed MOUS with 10 ministries for better implementation of Namami Gange. However, till date no detail is available as to how these ministries are functioning for better convergence.

Nation Mission for Clean Ganga (NMCG)

It has a five-tier structure at national, state and district level to take measures for prevention, control and abatement of environmental pollution in river Ganga and

to ensure continuous adequate flow of water to rejuvenate the river Ganga as below.

STRUStructureCTURE:

1. National Ganga Council under chairmanship of Prime Minister of India.

2. Empowered Task Force (ETF) on river Ganga under chairmanship of Hon’ble Union Minister of Jal Shakti (Department of Water Resources, River Development

and Ganga Rejuvenation).

3. National Mission for Clean Ganga (NMCG).

4. State Ganga Committees and

5. District Ganga Committees in every specified district abutting river Ganga and its tributaries in the states.

NMCG has a two-tier management structure and comprises of Governing Council and Executive Committee. Both are headed by Director General, NMCG.

Thus, the newly created structure attempts to bring all stakeholders on one platform to take a holistic approach towards the task of Ganga cleaning and rejuvenation.

The Director General (DG) of NMCG is an Additional Secretary in Government of India. For effective implementation of the projects under the overall supervision of NMCG, the State Level Program Management Groups (SPMGs) are, also headed by senior officers of the 

concerned States.

National River Conservation Plan

• The river conservation program was initiated with the launching of the Ganga Action Plan (GAP) in 1985.

• The Ganga Action Plan was expanded to cover other rivers under National River Conservation Plan (NRCP) in the year 1995.

• The objective of NRCP is to improve the water quality of rivers, which are major water sources in the country, through implementation of pollution abatement works in various towns along identified polluted stretches of rivers on cost sharing basis between the Central and state governments.

Namami Gange Programme

  • It is an Integrated Conservation Mission, approved as ‘Flagship Programme’ by the Union Government in June 2014 with budget outlay of Rs.20,000 Crore to accomplish the twin objectives of effective abatement of pollution, conservation and rejuvenation of National River Ganga.
  • Its implementation has been divided into Entry-Level Activities (for immediate visible impact), Medium-Term Activities (to be implemented within 5 years of time frame) and Long-Term Activities (to be implemented within 10 years).

Ganga Task Force

  • It is a special unit of the Territorial Army raised under the public participation component of the Namami Gange Programme. 
  • The unit is mandated to carry out rejuvenation of River Ganga through activities such as afforestation, monitoring of river pollution, patrolling of ghats, public awareness campaigns and assist civil administration during natural calamities in the three districts of Uttar Pradesh - Prayagraj, Varanasi and Kanpur.
image 347

Way forward

• Multi-dimensional approach: Many of the separated approaches like river-linking, riverfront development projects, access to toilets, making villages open defecation free, piped water supply in rural areas, need to integrate long-term ecological and sustainability goals.

• Organic agriculture: Agriculture along the entire riverbed should be organic.

• Liquid Waste Management:

o Decentralization of STPs: at the colony level.

o Reuse treated wastewater for irrigation and empty into natural drains. For all upcoming cities, smart cities and for those, whose master plans are not in place, earmark land for STPs.

• Develop and restore local storages (ponds, lakes, wetlands) as permanent solutions to both floods and droughts. Only 10 per cent of water received during monsoon rainfall is harvested. Restoration of ponds, lakes and wetlands should be an integral part of river

restoration and conservation strategy

• Restoring lower order streams and smaller tributaries in the Ganga Basin.

Subansiri river

Context: Recently, Subansiri Lower Dam project on the Assam-Arunachal border (at Gerukamukh in Assam’s Dhemaji district) was hit by a landslide during pre-monsoon rain in the region.

The Subansiri river

  • The Subansiri river has its origin in Tibet and it is an antecedent river. 
  • It enters India near the town of Taksing (Arunachal Pradesh) and flows east and southeast through Miri Hills, then south to the Assam Valley at Dulangmukh in Dhemaji district, where it joins the Brahmaputra River at Jamurighat in Lakhimpur district. 
  • Small tributaries of the Subansiri include Rangandi, Dikrong and Kamala. 
  • The Subansiri lends its name to two districts in Arunachal Pradesh: Upper Subansiri and Lower Subansiri. 
  • The high topographic variation makes this river a potential zone for harnessing it for hydropower. The districts situated on the bank of the Subansiri River are flood prone during monsoon season.
  • The Subansiri River is the largest tributary of Brahmaputra River. 

The Brahmaputra river

  • The Brahmaputra has its origin in the Chemayungdung glacier of the Kailash range near the Mansarovar Lake. From here, it traverses eastward longitudinally in a dry and flat region of southern Tibet, where it is known as the Tsangpo. 
  • The Rango Tsangpo is the major right-bank tributary of this river in Tibet. It emerges as a turbulent and dynamic river after carving out a deep gorge in the Central Himalayas near Namcha Barwa.
  • The river emerges from the foothills under the name of Siang or Dihang. 
  • It enters India west of Sadiya town in Arunachal Pradesh. Flowing southwest, it receives its main left bank tributaries, viz., Dibang or Sikang and Lohit; thereafter, it is known as the Brahmaputra.
  • The Brahmaputra receives numerous tributaries in its long journey through the Assam valley. Its major left bank tributaries are the Burhi Dihing and Dhansari whereas the important right bank tributaries are the Subansiri, Kameng, Manas and Sankosh. 
  • The Brahmaputra enters Bangladesh near Dhubri and flows southward.
  • In Bangladesh, the Tista joins it on its right bank from where the river is known as the Jamuna. It finally merges with the river Padma, which falls in the Bay of Bengal. The Brahmaputra is well-known for floods, channel shifting and bank erosion.