Digital Boost to Revive Solar Power Installation Scheme

Brief About PM-KUSUM

  • Program: Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM)
  • Budget: ₹34,000 crore
  • Objective:
    • Set up 100 GW of solar power plants on farmer-owned land
    • Install 14 lakh solar pumps
    • Solarise 35 lakh grid-connected agricultural pumps

Current Status (As of June)

  • Power Plants Installed: 256 MW
  • Solar Pumps Installed: 3.97 lakh
  • Solarised Pumps: 13,500
  • Revised Deadline: 2026

Key Challenges

  • Unavailability of Suitable Land:
    • Difficulty in pooling agricultural land parcels for power projects
    • Contrast with utility-scale projects in Gujarat and Rajasthan where vast tracts of desert land are used

Solutions and Innovations

  • Digital Platform Development:
    • Partner: Global Energy Alliance for People and Planet (GEAPP)
    • Technologies Used: Drone technology for land mapping
    • Objective: Enhance institutional capacity and connect farmers with power developers
  • Progress:
    • Installed Capacity in Rajasthan: 12.3 MW
    • Target for 2024: 100 MW
    • Planned Expansion: Applying the digital platform approach in Maharashtra and Madhya Pradesh

PM-KUSUM Scheme

KUSUM Scheme seeks to incentivise the farmers to set up solar powered plants in their fields so as to enable them to meet their energy needs and supplement their farm incomes. The idea is enable "Annadata" to become "Urjadata".

3 COMPONENTS

1- Setting up of 10,000 MW of Grid-Connected Solar and Other Renewable energy plants on Barren/Uncultivable land)-> Sell Power to DISCOMs and earn Income.
2- Off-Grid Areas: Replacement of diesel agriculture pump sets with 20 lakh Solar Agriculture Pumps-> Reduce the dependence of farmers on diesel and meet their irrigation needs.
3- Grid-connected Areas: Replacement of diesel agriculture pump sets with 15 lakh Solar Agriculture Pumps-> Use the generated solar power to meet the irrigation needs and the excess solar power will be sold to DISCOMs.

BENEFITS

-Environmental Benefit: Saving of about 27 million tonnes of CO2 emission per annum. 
-Economic Benefit: Reduce financial burden on DISCOMs; Promote Renewable Energy; Reduce import of Crude Oil and improve Trade Deficit.
- Benefit: Supplement Farm Income; Generate Self-Employment; Empowerment of Farmers.

HOW TO IMPROVE THE DESIGN OF THE PROGRAMME?

- Reducing Inter-state Disparity: Chhattisgarh and Rajasthan together account for half of two lakh solar pumps currently deployed in the country; Target linked financial assistance to reduce the disparities.
- Reducing Intra-state Disparity: Share of central financial assistance should be appropriated for small and marginal farmers/Women farmers. 
- Give up One Size Fits-all approach: Small and marginal farmers should be given a higher capital subsidy and long-term loans with interest subsidies.
- Focus on Efficiency of Pumps: Solarizing grid connected pumps must include replacement of the pump with more energy efficient newer age pumps. 
- Focus on post-harvest losses: Use solar power for post-harvesting processes to promote local value addition and enhanced income levels.

Previous year question (2020)

With reference to solar water pumps, consider the following statements:

  1. Solar power can be used for running surface pumps and not for submersible pumps.
  2. Solar power can be used for running centrifugal pumps and not the ones with piston.

Which of the statements given above is/are correct?

(a) 1 only

(b) 2 only

(c) Both 1 and 2

(d) Neither 1 nor 2

Ans:  (d)


Practice question

With reference to Solar power Installation scheme in India, consider the following statements:

  1. PM KUSUM scheme targets to install 1000 GW of Grid-Connected Solar and Other Renewable energy plants.
  2. To date, the government has installed over 70% of the solar power pumps it had targeted.

Which of the statements given above is/are correct?

(a) 1 only

(b) 2 only

(c) Both 1 and 2

(d) Neither 1 nor 2

Ans:  (d)

Explanation:

  • Program: Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM)
  • Budget: ₹34,000 crore
  • Objective:

    • Set up 100 GW of solar power plants on farmer-owned land
    • Install 14 lakh solar pumps
    • Solarise 35 lakh grid-connected agricultural pumps

Current Status (As of June)

  • Power Plants Installed: 256 MW
  • Solar Pumps Installed: 3.97 lakh
  • Solarised Pumps: 13,500
  • Revised Deadline: 2026

Share this with friends ->

Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 20 MB. You can upload: image, document, archive. Drop files here

Discover more from Compass by Rau's IAS

Subscribe now to keep reading and get access to the full archive.

Continue reading